Industrial flooring price per m²

Guide price for epoxy in the quote configurator; factory floors and specialist systems quoted after a site survey

We price a poured industrial floor per m², according to the system and the layer thickness. For Sikafloor-264 epoxy, solid-colour or with flakes, the quote configurator gives you a guide price: choose the floor type, enter your area and it works out the figure from our price list in Slovakia, in euros. Factory and warehouse floors with forklift traffic, and ESD, ATEX or hygienic floors, are priced on request after a site survey. We’re not VAT-registered, so no VAT is added to our prices. Transport is charged on top, depending on the location.

+421 948 143 981
Light grey poured floor in a factory

Work out your price per m²

For a guide price in euros, based on our price list in Slovakia, choose your floor type and enter your area in the quote configurator.

Calculate the price for my area

Why industrial flooring prices vary so much online

The figures you find when you search for “industrial flooring cost” can vary several-fold. Often it isn’t the same floor at a different price but a different job under the same name. On top of that, quotes switch between the terms resin floor, poured floor and epoxy floor, even though they may mean the same kind of layer.

The first difference is thickness. A roller-applied coating seals the concrete but doesn’t level out unevenness. A self-levelling layer flows level on its own once poured and covers minor unevenness. Mortar systems are thicker still and take more material and more labour.

The second difference is what the price includes. Some prices cover materials only, others labour only. A VAT-registered contractor adds tax on top of a net price; with us, nothing is added.

The third difference is substrate preparation and floor area. Grinding, crack repair and oil removal are sometimes included in the price and sometimes charged as extras. For small areas we apply a minimum charge. So when you compare two quotes, check them against these three points.

What makes up the price of a poured industrial floor

The price per m² in the quote configurator is for the poured layer only. Substrate preparation and any work your particular floor calls for are itemised separately in the quote.

  • Substrate preparation: grinding with dust extraction and vacuuming; on oil-contaminated concrete also Sikafloor-60 Buster or TopStone EP02 O primer.
  • Repairs: filling cracks and construction joints, and carrying structural movement joints through into the new layer with a flexible sealant.
  • Levelling: a levelling compound 4 to 10 mm thick where the concrete is markedly uneven.
  • Layers: primer, the main epoxy layers and an anti-slip broadcast; depending on how the space is used, also an ESD or ATEX layer or a hygienic surface.
  • Details: transitions, gullies, service penetrations and coving along the walls.
  • Transport: depending on the location you enter in the form.
  • Phasing: working in sections while the site stays in operation raises the price.

What pushes up the price of an industrial floor

  • Moisture in the concrete that has to be dealt with before pouring.
  • Oil soaked into the concrete.
  • Cracks, damaged joints and a crumbling surface.
  • An uneven substrate that needs a levelling compound.
  • An old coating that is peeling off.
  • A thicker layer for forklift traffic and heavier loads.
  • A requirement for ESD, ATEX, anti-slip or a hygienic surface.
  • An awkward layout with lots of transitions, gullies and penetrations.
  • Installation in phases while the site stays in operation.

What brings the price down

  • Dry, sound, level concrete with no oil.
  • One open area rather than several small rooms.
  • A cleared space that can be done in one go, without phasing.
  • A thickness matched to the actual load.

Industrial epoxy flooring: systems, thicknesses and price

The garage and workshop system has three components: Sikafloor-151 primer, Sikafloor-264 epoxy in two coats and quartz sand, which together give a thickness of about 1 mm. The epoxy can also be ordered as a 2 mm layer, which the quote configurator recommends for workshops, commercial premises and industry. We only specify the other systems after assessing the concrete — measuring moisture and checking strength, movement joints and cracks — which is why they have no set price per m².

SystemThicknessBest suited toPrice
Sikafloor-264 epoxy, 1 mm layer1 mmGarages, workshops, service baysin the quote configurator
Sikafloor-264 epoxy, 2 mm layer2 mmWorkshops, commercial premises and industryin the quote configurator
Epoxy with flakes1 mm or 2 mmGarages and workshopsin the quote configurator
Epoxy, polyurethane or a combination with a quartz broadcast2–6 mm depending on loadFactories and warehouses with forklifts and rackingon request
Anti-static ESD floorvaries by systemElectronics, server rooms, laboratorieson request
Dissipative floor for ATEX areasvaries by systemPaint shops and solvent storeson request
Hygienic surfacevaries by systemKitchens, bakeries, dairieson request
Anti-slip surfacevaries by systemWet and greasy areason request

How much downtime to expect

Downtime is part of the cost, even though it never appears on the invoice. While the floor is being laid and curing, the area can’t be used.

The first coat of Sikafloor-264 goes on about 12 hours after the Sikafloor-151 primer; at +20 °C the second follows no sooner than 24 hours later. The times in the table, which the manufacturer gives for Sikafloor-264, run from the second coat.

Pouring is only possible once both the air in the building and the concrete are at +10 °C or above. Only electric heaters are used to warm the space. For 24 hours after pouring, the floor must not be washed and condensation must not form on it. When the floor is poured in phases, these times apply to each section separately.

Indoor temperatureFoot trafficLight trafficFull cure
+20 °Cafter about 24 hafter about 4 daysafter about 7 days
+10 °Cafter about 3 daysafter about 6 daysafter about 10 days

What to send us for a quote

You can enter the details straight into the quote form or send them by e-mail. We’ll prepare a first quote from them and confirm the build-up at the site survey.

  • The floor area in m² and the town the floor is in.
  • The type of premises, for example a workshop, warehouse, factory or kitchen.
  • The load: the type of forklift or pallet truck, and the layout of racking and machinery.
  • What might be spilt on the floor and how often it is washed.
  • The substrate: concrete, screed or tiles, plus any old coating or oil stains.
  • Photos of the whole floor and close-ups of cracks and joints.
  • Any requirements for ESD, ATEX, anti-slip or a hygienic surface.
  • Whether the site has to keep running during the work, and how warm the building is in winter.

From our projects

All projects
  • Blue floor in a clean production area
  • Green floor in a factory corridor
  • Grey floor in an industrial unit with racking

Frequently asked questions

How much does industrial flooring cost per m²?

It depends on the system and the layer thickness. Sikafloor-264 epoxy for garages, workshops and commercial premises is laid as a 1 mm or 2 mm layer, solid-colour or with flakes; for a guide price from our price list in Slovakia, choose the floor type and enter your area in the quote configurator. Factory and warehouse floors with forklift traffic, and ESD, ATEX or hygienic floors, are priced after a site survey. No VAT is added to the price, but transport is added depending on the location, and substrate preparation depending on the condition of the substrate.

Does the price include VAT?

We’re not VAT-registered. The prices in our price list in Slovakia are final, and no tax is added to them on the invoice.

Is substrate preparation included in the price?

The price per m² covers the poured layer itself; substrate preparation is itemised separately in the quote. We grind and vacuum the concrete on every job. Levelling, crack repair and oil removal are added only when the site survey shows they’re needed.

Why is there no set price per m² for a factory or warehouse floor?

In a factory or warehouse, the build-up is decided by the load, the chemicals and the condition of the concrete. Thickness ranges from 2 to 6 mm depending on load, and an ESD, ATEX or anti-slip layer may be added to it. A single price per m² couldn’t describe that honestly, so we price these floors after assessing the substrate.

What is the minimum charge?

The quote configurator shows the minimum charge whenever it applies to your floor area. If a job would come to less at the price per m², this minimum is charged, because otherwise it doesn’t pay to bring equipment and materials to site for a small area.

Do you charge for transport?

Yes, transport is added to the price per m². How much depends on the site location you enter in the form.

Can the floor be done in phases, and how much extra does it cost?

Yes. We split the work into parts so that only one is closed at a time and the rest stay in use. Phasing raises the price, and the increase grows with the number of phases, because the crew returns to site for each one. We’ll agree the split and the order of the sections with you at the site survey.

How much does a resin floor cost?

“Resin floor” is another name for a poured floor made of epoxy or polyurethane. For what epoxy costs per m², see the quote configurator, which works from our price list in Slovakia. A polyurethane or combined system for a factory or warehouse is specified to suit the load and priced on request; you’ll find an overview of the systems on the industrial flooring page.

Send us the area and photos of your floor